AIDA Meeting - STFC RAL 19 January 2011 --------------------------------------- Present: PCS, VFEP, MK, IL, TD, ZL, SLT, DB, RDP Apologies: Summary of meeting ------------------ ASIC ---- 6 wafers delivered to SLT @ RAL Wafer dicing contract in place since before Christmas. From layout on wafer SLT has indicated which dies should be diced from wafer. 2 wafers -> dicing c. 1-2 weeks -> c. 400 dies available. Traceability per wafer (not per die) which in principle allows compensation for some types of wafer to wafer variations - SLT needs to request manufacturing process log data which can be delivered by e-mail. Some dies will placed in 40 pin plastic packages to test design changes at RAL - c.3-4 weeks FEE --- FEE64 PCB delivery delayed to Jan 24 - Jaltek will begin assembling PCBs (all components are already at Jaltek). Potential issues: LT power regulators (assembler is aware) Mezzanine PCB delivery delayed to bad weather - PCBs now at DL. Inspection at DL revealed quality issues which require re-work. Jaltek will X-ray all solder joints and re-work suspect joints. Jaltek quality manager will talk to PCS tomorrow pm. Expected delivery of re-worked PCBs should be OK wrt availability of diced ASIC dies. JT has delivered PowerStax PSU (for 8 FEE64 boards) plus cabling. Pre-production test of FEE64 PCB being planned (avoid committing a lot of expensive components) - principal tests PowerPC CPU and peripherals. Probably early February 2011. MK making preparations for pre-production tests: firmware, power system test with blanks PCB, firmware for new ADCs. Remember new PCB will use 1MHz clock (cf. 500kHz) so ASIC config parameters e.g. hold time cf. shaping time will need to be revised. Other parameters such as reset can probably be left as is. PCS has modified firmware; believes he has fixed front end lockup DAQ/software ------------ Require : 2+ production modules clock sync merge code Mechanical Design ----------------- Prototype ASIC heatsinks delivered and look OK. Production delivery by end of the January 2011. JS will arrange delivery of heatsinks plus assembly kits (screws, posts etc) to RAL for bonding of the ASIC dies. Al FEE support frame (middle & sides) will be delivered by start of February. Crate prototype available - JS will check. Production underway. Consolidated grant bid ---------------------- Commissioning Tests ------------------- We have requested 30 8h shifts for FRS commisstioning test in October 2011. Other ----- Next meeting: 13.30 Wed 16.2.11