AIDA Meeting - STFC DL 18 July 2012 ----------------------------------- Present: SLT, PCS, TD, PM, IL Apologies: Summary of meeting ------------------ ASIC ---- ~30 wire bonded since previous meeting Total of ~70 assembled modules ~8 modules to be assembled Very high yield of die onto mezzanine (failure mode observed was power supply circuit) - only 2 faulty dies found which have been replaced SLT to do ~2 weeks bench tests with ASIC to investigate overload recovery (link) circuit FEE --- - PCS working on waveform capture VHDL using 1x ASIC dev basis ~months dev to be done - 40x AIDA 26x LYCCA available will enquire of remainder to MK Software -------- Mechanical ---------- - support frame delivered last week - building further crates - setup plumbing with large recirculating chiller (water) - assembly complete by mid-September aim to build working (4x 8cmx8cm DSSSD) 8x module system for VFEP to develop DAQ system AoB --- Next meeting: doodle poll for mid-September